Design and Build Android-Based Applications of Software Development Projects Effort and Cost Estimation
DOI:
https://doi.org/10.25124/jrsi.v8i1.427Keywords:
Cost Estimation Software Estimation Kodular Function Points Use Case PointsAbstract
Prediction of software business and costs needs to be done carefully and clearly measured so that the
success of a software development project can be achieved. There are 2 methods that are commonly used
to estimate software development efforts and costs, such Function Points (FP) and Use Case Points. There
were 4 stages of the research carried out: literature study, needs analysis, design, and implementation
(application development to testing). Analysis and application design using the Signavio tools. Meanwhile,
the author uses open source rapid application development (RAD), called Kodular. The trial phase is
carried out by verifying manual calculations whose projects have been completed. The result of this
research is the creation of an Android-based application that can be used to accelerate business players in
the software development sector in the process of estimating product prices. This research has limitation is
not tested the validity of the soft development project which is still in the planning stage.